Bratsk Steel Mini-Mill

First Semi-Finished Casting Steelworks in Eastern Siberia

Project Founders:

Project Goals

Our plan is to launch the first steel Mini-Mill
in Irkutsk Region based on EAF (Electric Arc Furnace) technology for scrap melting with a target annual production capacity of
270,000-ton of steel rebars per year.

Создание современного предприятия

To build a modern technology steelworks industrial plant for steel rebars production to meet a high local regional market demand

Организация производства по утилизации лома

To create modern production of steel scrap recycling according to established ecological and energy efficiency standards. To rise local ecological awareness. To make new step to what a sustainable regional economy should look like.

Обеспечение продаж

To return the investment and to get the outstanding financial gain according to Project's Business Plan

Создание в регионе новых рабочих мест

To provide new jobs and employment to the local communities known for their family traditions in industrial production professions and high quality workers

Download our presentation
kit now

Download

Supported by all official authorities

01

The project has already got support from Plenipotentiary Representative of the President of Russia in Siberian Federal District

02

The project is already a part of the Official Plan for Social and Economical Development of Irkutsk Region from the Economical Development Ministry

03

The project is consistently supported by the Government of Irkutsk Region and the Governor of Irkutsk Region

04

The project has a long friendship with Corporation of Regional Economical Development of Irkutsk Region

Economic and Social Significance

Fully Approved, Prepared, And Ready For Construction

Approved by State Examination Committee
Approved by State Examination Committee
Building Permit Granted
Building Permit Granted
Public Hearings Passed
Public Hearings Passed
Technical Specifications for Electricity, Water, and Natural Gas Granted
Technical Specifications for Electricity, Water, and Natural Gas Granted
Approved by Rospotrebnadzor (Russian Agency for Health and Consumer Rights) Ecological Examination
Approved by Rospotrebnadzor (Russian Agency for Health and Consumer Rights) Ecological Examination

Price Chart for Metal Scrap and Construction Steel Bars

Download our presentation
kit now

Download

Latest technology and equipment from well-known brands

Modern Production Process

Second Production Line
Direct-reduced iron (DRI)

  • Product: Hot Iron Briquette
  • Product size: Length 110 х 50 mm, Thickness up to 35 mm
  • Target production per year: up to 600 000 tons
  • Technology: Natural Gas

Supply resources availability

01

Natural Gas demand is completely covered by the close availability of Bratskoye natural gas condensate field deposit

02

Electric Power provided by a separate segment from overhead electrical power transmission line, which comes directly from Bratsk Hydroelectric Power Station just near the construction site

03

Rich iron ore mines and iron ore pellets suppliers within 100 km radius

04

Water supply provided right from the Angara River nearby

  • Bratsk Steel Mini-Mill
  • Coal deposit
  • Gas condensate field deposit
  • Iron ore deposit

Location Map

Construction Site 1

Construction Site 2

Land area of 400 000 square meters. Registered land use is "land for settlements", the permitted use is "for the placement of industrial production buildings".

Land area of 86 812 square meters. Registered land use is "land for settlements", the permitted use is "for the placement of industrial production buildings".

Technical specifications for the electrical power consumption was already received (target power consumption is 90 MW). Short-term temporary technical specifications for the electrical power consumption for the construction time period was received (target power consumption is 1,5 MW). Completely approved by State Expertise.

The site has a 110/6 kV transformer substation with target power capacity of 41 MVA.

Natural gas consumption limits for the full capacity production was already reserved (27.2 million cubic meters a year). Completely approved by State Expertise.

Natural gas line and infrastructure design documentation was approved by State Expertise.

Water supply limits for the production process was reserved (215 cubic meters per hour) as well as drinking water limits (5 cubic meters per hour) and sewage system specifications.

The site already has all kinds of water supply and its own sewage system installed and ready.

Technical specifications for the logistics and transport communications was received as well as a permit for a railroad segment link within stations Gidrostroitel and Luzhki.

Railroad communications with an independed railroad segment is already linked with Gidrostroitel station.

Technical specifications for a separate highway segment link was received.

Automotive communications with an independent Viluy highway segment is already placed.

All project and design documentation was completed and approved. Building permit granted.

The site has more than 40 000 square meters of storehouses and administrative buildings in perfect condition.