Our plan is to launch the first steel Mini-Mill
in Irkutsk Region based on EAF (Electric Arc Furnace) technology for scrap melting with a target annual production capacity of
270,000-ton of steel rebars per year.
To build a modern technology steelworks industrial plant for steel rebars production to meet a high local regional market demand
To create modern production of steel scrap recycling according to established ecological and energy efficiency standards. To rise local ecological awareness. To make new step to what a sustainable regional economy should look like.
To return the investment and to get the outstanding financial gain according to Project's Business Plan
To provide new jobs and employment to the local communities known for their family traditions in industrial production professions and high quality workers
Download our presentation
kit now
The project has already got support from Plenipotentiary Representative of the President of Russia in Siberian Federal District
The project is already a part of the Official Plan for Social and Economical Development of Irkutsk Region from the Economical Development Ministry
The project is consistently supported by the Government of Irkutsk Region and the Governor of Irkutsk Region
The project has a long friendship with Corporation of Regional Economical Development of Irkutsk Region
The most important outcome of local steel rebar production will be that both new apartment construction and business construction will become more affordable. As the result, more people will be able to get a new modern home for their families and more businesses will be able to grow physically.
The construction of a new plant will provide a new development stage for the whole city of Bratsk through new apartment construction, social infrastructure, new communications and most importantly new steady influx of taxes in the city's budget.
Providing employment and new jobs.
An opportunity to provide more decent salaries for workers.
New jobs in Industrial production market mean new professions and education.
Providing Mill workers with good salaries will increase local consumer purchasing power too. Along with every new happy employee the city will gain new development for its services sector and small businesses.
Download our presentation
kit now
Product: Steel rebars with a diameter from 8 to 32 mm
Target production per year: 270 000 tons
Target output per hour: 40 tons
Standard billet size: 125х125 / 150х150 mm
Natural Gas demand is completely covered by the close availability of Bratskoye natural gas condensate field deposit
Electric Power provided by a separate segment from overhead electrical power transmission line, which comes directly from Bratsk Hydroelectric Power Station just near the construction site
Rich iron ore mines and iron ore pellets suppliers within 100 km radius
Water supply provided right from the Angara River nearby
Land area of 400 000 square meters. Registered land use is "land for settlements", the permitted use is "for the placement of industrial production buildings".
Land area of 86 812 square meters. Registered land use is "land for settlements", the permitted use is "for the placement of industrial production buildings".
Technical specifications for the electrical power consumption was already received (target power consumption is 90 MW). Short-term temporary technical specifications for the electrical power consumption for the construction time period was received (target power consumption is 1,5 MW). Completely approved by State Expertise.
The site has a 110/6 kV transformer substation with target power capacity of 41 MVA.
Natural gas consumption limits for the full capacity production was already reserved (27.2 million cubic meters a year). Completely approved by State Expertise.
Natural gas line and infrastructure design documentation was approved by State Expertise.
Water supply limits for the production process was reserved (215 cubic meters per hour) as well as drinking water limits (5 cubic meters per hour) and sewage system specifications.
The site already has all kinds of water supply and its own sewage system installed and ready.
Technical specifications for the logistics and transport communications was received as well as a permit for a railroad segment link within stations Gidrostroitel and Luzhki.
Railroad communications with an independed railroad segment is already linked with Gidrostroitel station.
Technical specifications for a separate highway segment link was received.
Automotive communications with an independent Viluy highway segment is already placed.
All project and design documentation was completed and approved. Building permit granted.
The site has more than 40 000 square meters of storehouses and administrative buildings in perfect condition.